GWC Helpdesk
Contact GWC
The key weaknesses identified in water infrastructure systems in urban and peri-urban areas in FCAS are:
In the context of the cholera epidemics in Haiti, a pre-crisis market analysis (PCMA) was conducted in Artibonite to study the suppl